English (US) | Français (CAN) | Europe | Français (Europe) |

Fort Worth Residence- Fort Worth, Texas


  • The ICF installation time included pouring concrete on upper deck area. Completion took an extraordinary amount of time because the project was largely constructed on weekends.
  • A significant amount of radius block was utilized for the retaining walls. Most of the retaining walls were 12” core, but some areas of lower heights were 8” and 6” core.
  • The project only had one door buck and no windows. The walls were deliberately not straight and also leaned toward the hill four inches out of plum.



PROJECT STATS

Location: Fort Worth, Texas
Type: Specialty Applications
Size: 2,580 sq ft
ICF Use:
2,300 sq ft (Waterfall, Pump Room, Retaining walls)
Total Construction: Undisclosed
ICF Installation Time: 30 days

CONSTRUCTION TEAM

Owner: Undisclosed
General Contractor: None
ICF Installer: Cameron Ware
Architect: Undisclosed
ICF System: Nudura Inc.