English (US) | Français (CAN) | Europe | Français (Europe) |

Ecologia Montréal - Québec, Québec City


  • The structure of the house is built using Nudura Insulated Concrete Form, a part of the material is constituted of 100% recycled materials.
  • The concrete supplied by Holcin contains 29% of recycled material and flying ashes.
  • There is a green living roof, solar panels and geothermal included in this build to make the home extremely efficient.
  • The Ecologia Montréal home is on its way to being the first LEED Platinum certified in Québec.



PROJECT STATS

Location: Québec, Québec City
Type: Residential
Size: 2,900 sq ft.
ICF Use: 3,300 sq ft
Cost: $800,000
Total Construction: 365 Days
ICF Installation Time: 120 Days

CONSTRUCTION TEAM

Owner: Sabine Karsenti
General Contractor: Gervais Fortin
Form Distributor: Pierre Brideau
ICF Installer: Sabine Karsenti
Architect: Gervais Fortin
ICF System: Nudura Inc.

DOWNLOAD

  • Project Profile PDF

CONTACT US

We’re committed to supporting homeowners and design professionals who are interested in or use our products. We’re always happy to help and provide more information.