Location: Marble Falls, Texas Size: 65,000 sq. ft. Cost: $10,000,000 Total Construction: 450 Days ICF Installation Time: 120 Days
Construction Team
Owner: First Baptist Church of Marble Falls ICF Installer: Mike Pilley Architect: RVK Architects
The design of this structure consisted of the installation of metal structure within the ICF envelope.
The ICF was incorporated throughout the entire building envelope, including the gables and contributing greatly to the overall energy performance of the church.
The sound protection provided by the ICF was notably apparent during the Summer Boat Races that occurred, although they are heard from miles they were unheard from inside the church due to soundproofing walls.